This new build development in Portstewart was constructed on a site that had remained vacant for a number of years, transforming an underutilised space into a high-quality residential property. The project delivers two well-designed three-bedroom apartments, each finished to a full turnkey standard and ready for immediate occupation.
The development was carefully planned to maximise the potential of the site while creating modern, comfortable living spaces suited to the local market. Each apartment has been designed with a practical layout, offering bright, spacious interiors and a high-quality finish throughout.
Derek Faulkner Contracts managed and delivered the full construction of this development, overseeing all stages from initial site preparation through to final completion and handover.
Developing on a site that had been vacant for a prolonged period required careful planning and preparation to ensure a solid foundation for the build. Our team approached the project with a structured and efficient programme, ensuring that each stage was delivered to a high standard.
A key focus was delivering a full turnkey finish, allowing the properties to be brought to market ready for immediate use. Attention to detail was maintained throughout, from the structural build to the internal finishes, ensuring consistency and quality across both apartments.